Introduction
The pipeline works authorisation is a set of documents that are submitted by the operator to the regulator for health and safety purposes. The following information must be provided on the application for PWA consent are:
DepCon1:
Note that where there are no objections it takes approximately four months from receipt of the application to issuing the authorisation
Notable Projects
Project Name |
Project Number |
Notes |
BAOBAB |
Notable due to the Pipe in Pipe nature |
|
Greater Plutonio |
Deep Water, using SAFEBUCK | |
Qatar Gas |
KW |
Large Diameter Pipe |
Other Projects
Project Name
|
Project Number | Notes |
EPC2B |
KW 0728 |
Controlled Buckles on Existing Pipeline Crossings |
Algeria Pipeline |
KW 1071 |
Onshore |
Deep Panuke |
Codes & Standards
Company |
Title |
Doc Number / Date |
SAFEBUCK JIP |
Safe Design of Pipelines with Lateral Buckling - Design Guideline |
|
DNV |
Global Buckling of Submarine Pipelines |
DNV-RP-F110 |
DNV |
Submarine Pipeline Systems (Strain Based Limit State) |
DNV-OS-F101 |
Course Notes
Author |
Title |
Notes |
C. Sicilia |
Lateral Buckling Assessment and Mitigation Design |
|
Trevor Gee IBC |
Pipeline Course |
Books
Author |
Title |
Chapter |
Mikael Braestrup |
Design and Installation of Marine Pipelines |
6.5 |
Papers
Author |
Title |
Notes |
Hobbes, R. E. |
In-service Buckling of Heated Pipelines, Journal of transportation Engineering, ASCE, Vol. 110, No.2, March 1984, pp. 175-189 |
Approximate method for determining propensity for lateral buckling |
Taylor, N. and Gan, A. B |
Submarine pipeline Buckling – Imperfection Studies, Jour. Of Thin-walled Structures, Vol. 4, 1986, pp 295-323 |
A developed version of ‘Hobbs’, including the effects of initial OOS |
Prepared Calculations
Title / Software |
Description |
Owner / Athor |
Hobbs / Excel |
Predicts the onset of buckling |
KAJW / CSG |
Pipeline Works Authorisation